Sell Large size biogas plant for industry or home By Chongqing MOLA Energy Technology CO., Ltd, China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell Large size biogas plant for industry or home

Sell Large size biogas plant for industry or home

( Negotiable )

|

Minimum Order

Localit:

CHONGQING

Prix de commande minimale:

-

Commande minimale:

1 Set

Packaging Detail:

Cartons

Delivery Time:

Within 15 days

Supplying Ability:

30 Set per Month

Payment Type:

T/T, L/C

Contacter maintenant
Membre gratuit

Personne à contacter Nancy

重庆江北区华新街, Chongqing, Chongqing

Contacter maintenant

Description

Specification
1.Biogas plant 
2.Long service life
3.Low maintenance cost
4.Environment-friendly

 
The Biogas Plant of double diaphragm is made of high-strengthened, high-elastic synthetic engineering diaphragm and of perfect anti-acid and anti-corrosion ability. Its capacity of absorbing the ambient heat and storing it is *0% higher than that of other material.


The Biogas Plant is made by adopting technology of combining internal digester and external protector. In this way ,it not only minimizes the possibility of doing damage to the internal digester, prolong its lifespan, and also create an complete Oxygen-free room for anaerobic micro organisms to do fermentation, which in return increases the Biogas Output ratio.
Product  parameter
                                       
Advantage
1.Economic and durable, low price, less investment
2.Light weight, folding, small volume, convenient transportation and carrying
3.The technology of the whole equipment series can also be customized
4.Health environmental protection, no pollution
5.The equipment is very safe
6.Installation is simple and quickp;
Biogas System Produce Line

Testing&Installing


Packing&Shipping


Equipment for biogas system


After-sale guide
Try our EASY FIXES before calling a technician
Has the biogas stopped?
• Check the level of the top drum to see if there is biogas.
• Check your phone for a message that your biogas credit has run out.
Is the stove flame low or is the lamp dim?
• Make sure all valves are fully open.
• Check the level of the top drum to see if there is biogas.
• Make sure that fresh dung has been loaded.
• Check all hosepipe for kinks.
• Make sure the appropriate weight is on top of the digester.
 Is the biogas system overflowing from the sides?
• Check the outlet valve for blockages and clean out any dried cow dung.
Is the dung not going into the biogas system?
• Make sure the outlet is clear
• Try to load it again in 5 hours or when the top drum rises 1 foot.
 Are you having trouble paying for biogas?
• Call Takamoto Biogas ***********8. We are open Monday to Friday 9am to 5pm.
Are you still having a problem?
• If you have tried our quick fixes but are still having a problem, call Takamoto Biogas ***********8. We are open Monday to Friday 9am to 5pm.
If you are interested in our other products:   
Skype mola-nancy.(Chongqing China)  
nancyATmola-energy.com
**********0 or *******4

 
 

Send a direct inquiry to this supplier

To:

Nancy < Chongqing MOLA Energy Technology CO., Ltd >

Je veux savoir: