GCW series demineralized water, water purification dedicated high temperature water chiller By Nanjing JIUDING Refrigeration & Air conditioning Equipment Co., Ltd, China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
GCW series demineralized water, water purification dedicated high temperature water chiller

GCW series demineralized water, water purification dedicated high temperature water chiller

|

Minimum Order

Localité:

-

Prix de commande minimale:

-

Commande minimale:

-

Packaging Detail:

Standard Exporting Wooden case Packing

Delivery Time:

30 days

Supplying Ability:

-

Payment Type:

T/T, L/C

Contacter maintenant
Membre gratuit

Personne à contacter Mr. Victor

No.8 West Longzhong Road,Luhe Economic Development Zone,, Nanjing, Jiangsu

Contacter maintenant

Description

GCW series demineralized water, water purification dedicated high temperature water chiller, integrating the advanced technology of both domestic and overseas, is with high efficiency, more energy saving, and better environmental protection, based on the company many years’ experience of production processing & construction in photovoltaic solar photoelectric, electronics industry. This unit can provide *0 ℃ ~ *0 ℃ high temperature water, & take the place of traditional 7 ℃ water chiller which uses the board and the secondary pump, with the effect of saving energy and reducing the initial investment at the same time, the comprehensive energy saving efficiency can reach to *5 ~ *5%.

This product has applied for national patent: Z**********9.3

Specificaton & Trade Terms

Model CW (R) F
Place Of Origin China
Packaging Standard Exporting Wooden case Packing
Brand JIUDING
Gurantee Life long time Warranty Service
Certifications ISO ***1
Price Term FOB,CIF,etc
Payment Term T/T,L/C,
Loading Ports Nanjing Port, Shanghai Port,
Delivery Time *0 days

Send a direct inquiry to this supplier

To:

Mr. Victor < Nanjing JIUDING Refrigeration & Air conditioning Equipment Co., Ltd >

Je veux savoir: