FOB Price
Obtenir le dernier prix500 ~ 800 / Piece ( Negotiable )
|Minimum Order
Localité:
China
Prix de commande minimale:
Commande minimale:
20 Piece
Packaging Detail:
standard packing
Delivery Time:
10 days
Supplying Ability:
200000 Piece per Year
Payment Type:
T/T, L/C, Western Union
Personne àcontacter Bruce
No. 168, Wenxing Street, Dalu Town, Bishan County, Chongqing, Chongqing, Chongqing
Model |
1WG6.****5FC-ZC |
|
Structure Form |
Front Load |
|
Gearshift Transmission Method |
Gear transmision |
|
Connection Method |
Straight |
|
Fuel Consumption (kg/h m2) |
≤*0 |
|
Working Peformance h m2 (h.m) |
≥0.*5 |
|
Tilling Depth(cm) |
≥*0 |
|
Tilling Scope (cm) |
≥**5 |
|
Working Speed (m/s) (forward/backford) |
0.**0.3 |
|
 |
 |  |