FOB Price
Obtenir le dernier prix( Negotiable )
|Minimum Order
Localité:
-
Prix de commande minimale:
-
Commande minimale:
1
Packaging Detail:
export standard, or on your request.
Delivery Time:
Normally within 30 days, or on your request.
Supplying Ability:
100000 Unit per Year
Payment Type:
T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal, Other
Personne àcontacter Mr. Joe
20 Jinsiqiao Road, Wenzhou, Zhejiang
Reactive Power Compensation, or power factor correction(PFC), can lower
your utility bills starting on the day the equipment is installed. Installation is
fast and easy, minimizing downtime. After the equipment is installed, you
should notice an immediate improvement in power factor, more efficient use
of your power system\'s load, and of course, monthly savings in your electric
utility bills.
Voltage Ratings from **0 to **0 VAC
Harmonic Filtering for Optimum Power Quality
Small Footprint with Maximum KVAR
Standard Off-The-Shelf Units and Specification Designed
Upgradeable Modular Construction
Stand-Alone, Multi-Unit and Integrated Systems