peri formwork , doka formwork, formwork, concrete formwork By hebei hualin international trade co., ltd, China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
peri formwork , doka formwork, formwork, concrete formwork

peri formwork , doka formwork, formwork, concrete formwork

( Negotiable )

|

Minimum Order

Localité:

-

Prix de commande minimale:

-

Commande minimale:

100 Piece

Packaging Detail:

pallet

Delivery Time:

timely

Supplying Ability:

1000 Piece per Month

Payment Type:

T/T, L/C

Contacter maintenant
Membre gratuit

Personne à contacter Ms. allian

598 heping, Shijiazhuang, Hebei

Contacter maintenant

Description

Specifications

Aluminum Formwork For Contruction
1.cycle use
2.easy to handle
3.light weight,high strength
4.environmental friendly

 

3. Advantages of aluminum formwork system:

 

1. Fast speed of construction: The construction working cycle is **5 days per floor. Its effective for cost saving in human resource and construction management.

 

2.Low using cost: formwork can be re-used over ******0 times and still keeps high quality to finish forming concrete surface. Also the average cost of using in each time is low.

 

3.Construction more easily, conveniently and effectively:

 

4. High stability and load bearing capacity : the formwork made of ****-T6 aluminum alloy plate and aluminum alloy profile.

 

5.The concrete surface after dismantling: It would be a very high quality finishing. The concrete surface is flat, smooth. No need heavy backing plaster. Effectively for plaster cost saving.

 

6.No construction waste: Spare parts included pins and wedges should be recycled. Worksite would be a safety, clean and tidy environment.

 

7. Strong versatility: Dimensions of most of the formworks which used in different structural drawings are the same. It means that when you have a new different project, *0%**0% formworks of the last project could be recycled.

 

8. Recovery of high value: After formworks lost a value in usage, the aluminum material could be re-sold to the market with a high price.

9.Ms allian Jia,  allian***8 at **6 dot com.   mobile:*************6

Welcome to contactme at anytime, i will try my best to help you!!!

Send a direct inquiry to this supplier

To:

Ms. allian < hebei hualin international trade co., ltd >

Je veux savoir: