FOB Price
Obtenir le dernier prix100 ~ 700 / Unit ( Negotiable )
|Minimum Order
Localité:
guangzhou
Prix de commande minimale:
Commande minimale:
1 Unit
Packaging Detail:
carton with wooden shelf
Delivery Time:
within 15 days
Supplying Ability:
1000 Unit per Month
Payment Type:
T/T, Other
Personne àcontacter Mr. jack
no.8,waihai industrial zone,baiyun district, Guangzhou, Guangdong
Min.order: | 1Â piece | Â | Min.order: | 1Â piece |
Model | DKL**0 | Â | Model | DKL**0 |
Dimension(mm) | ***0***0***0 | Â | Dimension(mm) | ***0***0***0 |
bakeware norm: | **0x**0mm |  | bakeware norm: | **0x**0mm |
bakeware no: | 2 |  | bakeware no: | 3 |
power: | 6KW | Â | power: | 8KW |
voltage: | **0/**0V | Â | voltage: | **0/**0V |
temperature range: | ****0℃ |  | temperature range: | ****0℃ |
material: | stainlees steel |  | material: | stainlees steel |
power source: | Electric |  | power source: | Electric |
Type: | turbo oven |  | Type: | turbo oven |
controlling mode: | digital timer |  | controlling mode: | digital timer |
can put salte |  |  | can put salte |  |
Frequency: | *0/*0Hz | Â | Frequency: | *0/*0Hz |