FOB Price
Obtenir le dernier prix|
Minimum Order
Localité:
fujian
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
wood crates
Delivery Time:
Lead time 15-25days
Supplying Ability:
20 Set per Day
Payment Type:
T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal, Other
Personne àcontacter Melody
Rm 139 No .100 Nanshan road, Xiamen, Fujian
Project situation: Totally invest **9.8 hundred million into Jiashao crossing sea bridge. The whole line is designed 8 lane according to express way construction standard. Plan to open the traffic in ***2. The bridge is from South lake transbay- the crossing of  Fu hang yong express road and the Zhe Jia Su express road, to Gu zhu transbay –the crossing of Fuyong express way and Shangsan express way. The bridge crosses Ch'ien-t'angRiver and the whole lenth is *9.**2km. The main road lenth is ***0m. It will be the longest and widest multi towel cable-stayed bridge in the world. Construction situation: The diameter of the steel pipe sheet is *******0mm. The driving depth is *2m**6m.Geology situation: silty sand
Specification:
Model | DZJ***0 |
Moter Power | **0 KW |
Eccentric Moment | ***4 Nm |
Driving Force | *****2 Kn |
Speed | ****0 r/min |
Amplitude | **7.*5 Mm |
Maximum Line Pull | **8 Kn |
Length | 2.0m |
Width | 1.9 m |
Height | 3.5 m |
Weight | ****0 Kg |
Project:
Â