Factory smd3014 tube8 new led tube lights By Double L Trading Co., Ltd., China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Factory smd3014 tube8 new led tube lights

Factory smd3014 tube8 new led tube lights

2 ~ 20 / Piece ( Negotiable )

|

Minimum Order

Localité:

China

Prix de commande minimale:

Commande minimale:

10 Piece

Packaging Detail:

25pcs/ctn

Delivery Time:

3-15 days after payment received

Supplying Ability:

10000 Piece per Month

Payment Type:

PayPal, Western Union, L/C, T/T

Contacter maintenant
Membre gratuit

Personne à contacter Ms. Leslie

fuyong road, Zhuhai, Guangdong

Contacter maintenant

Description

Factory smd***4 tube8 new led tube lights

1. Using 1/2 aluminum pipe structure, good appearance ,good heat dissipating capacity

2. Built-in constant current driver, high efficiency, stability

3. Using the high quality SMD as light source, high light efficiency, long life span.

4. Quick response, the LED response time is nanosecond.

5.Environmental protection, no heavy metals or harmful gas.

6.Energy-saving, can save energy *0% than traditional fluorescent lights.

7.No flicker, start quickly, soft light, protect your eyes.
 

  Application(General lighting)

1. Apply to hotel, shopping malls etc., can be universally used for decorative lighting of various commercial place.
2. Apply to office, meeting room, exhibition hall, can be used for interior lighting in the office building.
3. Apply to residential lighting such as aisle, washroom, corridor, storehouse, etc.
4. Apply to shop window, painting displaying, artwork performance, etc., can be used for partial close-up lighting.
5. Apply to cafe, bar etc., can be used for entertainment lighting

  Trade Terms

1. Payment: T/T only *0% deposits before production, *0%balance to be paid before deliver (Western Union or Money gram are welcomed)
2. Production Lead Time for **0~**0pcs: 5~7days
3. Sample can be delivered in 3days
4.Shipping freight are quoted under your requests
5.Shipping port: zhuhai, Mainland China
6.Discounts are offered based on ord er quantities

  The usage of the smd***4 *****5v t8 led tube


 
  Assembly shop
 

 

  Product Packaging

 

 

 

  Factory Strength
 

 

  The workshop

 

 

 

 

 

  The  smd***4 *****5v t8 led tube showroom  
 
 
 
  Transportation
 

 

Send a direct inquiry to this supplier

To:

Ms. Leslie < Double L Trading Co., Ltd. >

Je veux savoir: