FOB Price
Obtenir le dernier prix200 ~ 500 / Piece
|Minimum Order
Localité:
China
Prix de commande minimale:
Commande minimale:
1 Piece
Packaging Detail:
wooden box
Delivery Time:
7 days
Supplying Ability:
1 Piece per Day
Payment Type:
T/T, Western Union
Personne àcontacter madery
Jining , Shandong
Model | B*7 | B*0 | B*7 | B*7 | B*0 |
Length | **0mm | **0mm | **5 mm | **6 mm | **5mm |
Weight | *1.5kg | *8kg | *0 kg | *9 kg | *4Kg |
Air pressure | 0.*3mpa | 0.*3mpa | 0.*3mpa | 0.*3 Mpa | 0.*3 Mpa |
Impact frequency | *1.6hz | *2 hz | *4 hz | *8 hz | *6HZ |
Gas consumption | *3l/s | *3 l/s | *2 l/s | *5 l/s | *7L/s |
Shank specification | *5***8 mm | *5***8 mm | *5***8 mm | *2***2mm | *2***2mm |