FOB Price
Obtenir le dernier prix200 ~ 500 / Piece
|Minimum Order
Localité:
China
Prix de commande minimale:
Commande minimale:
1 Piece
Packaging Detail:
wooden box
Delivery Time:
7 days
Supplying Ability:
1 Piece per Day
Payment Type:
T/T, Western Union
Personne àcontacter madery
Jining , Shandong
Model | D3 | D4 | D6 | D9 |
Weight | 2.5kg | 3.6kg | 6kg | 9kg |
Working pressure | 0.*3 mpa | 0.*3mpa | 0.*3mpa | 0.*3mpa |
Gas consumption | 0.*5 l/s | 0.*5l/s | 0.*5l/s | 0.*5l/s |
Impacttimes | **0hz | **0hz | **0hz | **0hz |
Piston diameter | *7mm | *0mm | *5mm | *2mm |
Structure stroke | *2mm | **8mm | **5mm | **7mm |
Hammer diameter | *2mm | *6mm | *2mm | *4mm |
Air tube bore | *3mm | *3mm | *3mm | *3mm |
Total length | **0mm | **0mm | **5mm | ***0mm |