Refrigerator Cabinet Foaming Fixture By Anhui SUNMINE Mechanical And Electronic Equipment Manufacturing Co., Ltd, China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Refrigerator Cabinet Foaming Fixture

Refrigerator Cabinet Foaming Fixture

|

Minimum Order

Localité:

-

Prix de commande minimale:

-

Commande minimale:

-

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

-

Payment Type:

Western Union, L/C, T/T

Contacter maintenant
Membre gratuit

Personne à contacter Shi

No. 22, Outang Road, Chengdong Industrial Park, Chuzhou, Anhui, China, Chuzhou, Anhui

Contacter maintenant

Description

1. Main Parameters.
? Sizes of Appliable Products: W**0mm * H***0mm * D**5mm  (designed as per user`s products. ) 
   The Dimensions of inner space when foaming fixture shut: W**0mm * H***0mm * D**5mm (*0.3~*0.5mm).
? Outer Dimensions of Foaming Fixture: as per design.
? Injection Type: Vertical Manual Injection with One Gun.
? Foaming Material: POL+ISO
? Heating Type: with Water through TUC.
? Curing Temperature: *0?~*0? (adjustable).
? Curing Time: Less than *0 minutes (adjustable).
? Electricity: *5 KVA (3 Live Wires, 2 Neutral Wires, 1 Earth Wire, **0V, Voltage Â±*0%, *0Hz). The voltage out of controlling box for units: DC*4V.
? Air Capacity: 0.1 m³/minute, 1 ?(0.5Mpa~0.8Mpa).
? Machinery Color: As per user`s requirements.
2.Main Components:  
? Foaming Fixture:   1 set.
? Air-Cushion Trolley:   1 set.
? Injection Platform:   1 set.
? Protection Part:   1 set.
? Water Heating System:   1 set.
? Pneumatic System:     1 set.
? Electricity Controlling System:   1 set.
3. Manipulation Processes
? Pre-loading of the Cabinet is completed manually on the air-cushion trolley.
?Open air way and worker manually puts the air-cushion trolley together with cabinet into foaming fixture.
? The front plate is driven by air cylinder to shut.
? When the front panel get to right position, side panel starts to move until gets upright to lock the platform on air-cushion trolley.
? Turn air-input valve off to make the trolley get out.
? When the moulds are heated to required temperature, manul injection begins. Then, the solidification of the cabinet comes up.
? After solidification finished, open air-input valve of trolley to bear platform. Besides, side panel moves.
? Open front panel.
? Pull trolley out manually.

 

Send a direct inquiry to this supplier

To:

Shi < Anhui SUNMINE Mechanical And Electronic Equipment Manufacturing Co., Ltd >

Je veux savoir: