FOB Price
Obtenir le dernier prix200 ~ 400 / Piece ( Negotiable )
|Minimum Order
Localité:
Suzhou
Prix de commande minimale:
Commande minimale:
100 Piece
Packaging Detail:
Polybag for 4.3-6.1m industrial aluminum scaffolding
Delivery Time:
30 days after receipt of deposit
Supplying Ability:
8000 Piece per Month
Payment Type:
T/T, L/C
Personne àcontacter Mr. Steven
No.109 Maopeng Road, Suzhou, Jiangsu
4.**6.1m industrial aluminum scaffolding
scaffolding
Features:
1) This kind of Scaffolding has fewer
components, easy and quick assembly
2) Advanced structural design, heavy load bearing capacity
3)easy to operate and safe for up and
down
4) Each support can be adjusted
according to different purpose
5) Single scaffold kit, no extra clamps or accessories required, no
small parts
6) Individual scaffolding parts can be packed in bundles for easy storage and transportation
Scaffold (also compatible with all round, ring lock, multi-directional, sure lock system or quick erection system etc) is a modular scaffold system.
Model
|
Layer | Total Height mm | Height of working board mm | Dimension of working board mm | Dimension mm | Weight kg |
ATL**-A
|
2 | ***3~***3 | ***0~***2 | **9~**2 | **0~***0 | *5 |
ATL**-A
|
3 | ***3~***3 | ***0~***0 | **9~**2 | **0~***0 | *6 |