FOB Price
Obtenir le dernier prix9 ~ 15 / Piece
|Minimum Order
Localité:
Tianjin
Prix de commande minimale:
Commande minimale:
2000 Piece
Packaging Detail:
Standard export package
Delivery Time:
Within 20 days
Supplying Ability:
10000 Piece per Day
Payment Type:
D/P, D/A, L/C, T/T
Personne àcontacter Ms. Yamin
No.46 Renmin East Road, Changsha, Hunan
Steel prop for scaffolding
heavy duty and light duty
Steel Props are infinitely reusable
product used to support formwork shuttering. Their telescopic
function allows speedy erection and dismantling without tools and
it has no loose parts to be mislaid or lost.
Components: Steel Tube, Prop Sleeve, U-Head and
Square or other shape Plate.
Finishing:Pre-Galvanized, Hot Dipped Galvanized,
Painted
Min | Max | Internal Tube | External Tube |
---|---|---|---|
1.8M | 3.2M | *8mm x 2.0 mm | *0mm x 2.0mm |
2.1M | 3.4M | *8mm x 2.0mm | *0mm x 2.0mm |
2.2M | 4.0M | *8mm x 2.0mm | *0mm x 2.0mm |
2.4M | 3.9M | *8mm x 2.0mm | *0mm x 2.0mm |
3.5M | 4.0M | *8mm x 2.0mm | *0mm x 2.0mm |
3.0M | 5.0M | *8mm x 3.5mm | *0mm x 3.5mm |
Light Duty Props
Min | Max | Internal Tube | External Tube |
---|---|---|---|
1.6M | 3.0M | *0mm x 2.0mm | *8mm x 2.0mm |
*8mm x 2.0mm | *6mm x 2.0mm | ||
1.8M | 3.0M | *0mm x 2.0mm | *8mm x 2.0mm |
*8mm x 2.0mm | *6mm x 2.0mm | ||
2.0M | 3.0M | *0mm x 2.0mm | *8mm x 2.0mm |
*8mm x 2.0mm | *6mm x 2.0mm |