Sell Fish feed production line By Sino APS Company Limited, China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell Fish feed production line

Sell Fish feed production line

( Negotiable )

|

Minimum Order

Localité:

China

Prix de commande minimale:

-

Commande minimale:

1 Piece

Packaging Detail:

Wooden case

Delivery Time:

30 days

Supplying Ability:

10000 Set per Month

Payment Type:

T/T

Contacter maintenant
Membre gratuit

Personne à contacter Mr. Zhang

Wr6132, East Fushou, Weifang, Weifang, Shandong

Contacter maintenant

Description

TECHNICAL PARAMETERS & RELEVANT SERVICES
1.Output: ******0 Kg/hr
2. Square for workshop: *8m2  and 5m high
3. Installed Capacity: *0kw
4. Voltage / Frequency (3 phase): **0V / *0Hz
5. Dimension (m): *4.0 x 2.0x 5
6. Workers Required: **3 Workers
7. Warranty: At least 1 year from the date of completion of the commissioning.
8. Installation/Operation/ Service/ Maintenance Manual:  Provided In English
PRE-SHIPMENT INSPECTION INCLUDES
 

  • Supplier should trial run whole line at supplier’s factory before shipment;
  • All raw materials for that trial run to be arranged by supplier at their cost.
EACH CLIENT CAN ENJOY THE FOLLOWING 7 SERVICES 
 
  1. Free consultation service before, during, and after sales;
  2. Free project planning and design services;
  3. Free debugging of equipment until everything is functional;
  4. Free management of equipments' long distance shipping;
  5. Free training of equipment maintenance and operating personally;
  6. Free new production techniques and formulas;
  7. Provide 1 year complete warrantee and lifetime maintenance service;        
INSTALLATION SUPERVISION AND COMMISSIONING Including salaries based on *0 hours per week as well as accident-and health insurance for:
 
  • Chief Installation Engineer for the duration of two weeks in total.   
  • Process Engineer for the duration of two weeks in total,
  • Electrical commissioning-Engineer for the duration of two weeks in total
The customer will be asked to provide room, board, round-trip transportation, and a nominal $*0 daily subsidy per person.
 
Period of installation:
The total length of the installation time depends on number and qualification of the available local stuff. A possible delay of the installation period will be additionally invoiced.
Remark: We will provide on-site service after 1 year. The customer will be asked to provide room, board, round-trip transportation, and a nominal $*0 daily subsidy per person.
 

Send a direct inquiry to this supplier

To:

Mr. Zhang < Sino APS Company Limited >

Je veux savoir: