FOB Price
Obtenir le dernier prix5 ~ 1000 / Piece ( Negotiable )
|Minimum Order
Localité:
Shandong, China
Prix de commande minimale:
Commande minimale:
10 Piece
Packaging Detail:
standard export packing
Delivery Time:
within 15 days after deposit received
Supplying Ability:
10000 Piece per Month
Payment Type:
T/T, L/C, Western Union, PayPal
Personne àcontacter Cindy
ON.178 Jianxin Street, Shouguang Shandong Province,262700, Weifang, Shandong
Processing | Machines | Need Level |
1. Inspection | Inspeciton Machine | Must |
2. Buffing | Tyre Buffer | Must |
3. Dust Collecting | Dust Collector | Must |
4. Cementing | Mixing Machine | Must |
5. Filling | Extruding Machine or Extruding Gun | Must |
6. Tread Application | Building Machine/Tyre builder | Must |
7. Assemble the inner tube | Small Tyre Spreader | Must |
9. Tyre Carrying | Tyre Conveyor | Must |
*0. Curing | Segmented Mold/Mould | Must |
*1. Accessory Machine | Boiler | |
Air Compressor | ||
Air Storage |
Processing | Machines | Need Level |
1. Inspection | Inspeciton Machine | Must |
2. Buffing | Tyre Buffer | Must |
3. Dust Collecting | Dust Collector | Must |
4. Cementing | Mixing Machine | Must |
5. Filling |