FOB Price
Obtenir le dernier prix( Negotiable )
|Minimum Order
Localité:
Zhangjiagang city,China
Prix de commande minimale:
-
Commande minimale:
1 Piece
Packaging Detail:
Wooden pallet with plastic film covered
Delivery Time:
60 working days since the date of receiving down p
Supplying Ability:
-
Payment Type:
L/C, T/T
Personne àcontacter miller
NO.32 Zhenxing Road,Economic Development Zone, Zhangjiagang.jiangsu, zhangjiagang, Jiangsu
Characteristics
Mechanical blades advancing method, speical blades structure, siutable for cutting pipes of big wall thickness, smooth cutting surface.
Adopt PLC synchronization control,
Cutting range: *****0mm