FOB Price
Obtenir le dernier prix|
Minimum Order
Localité:
China
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
Seaworthy Package
Delivery Time:
1 Year Around
Supplying Ability:
1 Piece per Month
Payment Type:
-
Personne àcontacter Mr. Shijie
Hongkong Middle road No.12, Qingdao, Shandong
Power plant high efficiency equipment:
Since Runh has been experienced in engineering, if necessary, engineers and technicians of all sorts can be sent to guides the erection, construction, commissioning and the maintenance of the power plant. Runh supply long-term after-sals service for the sold units and the equipments so as to relieve the user's triuble.
RUNH provides boiler retrofit solution for the problems of low boiler output, low thermal efficiency, poor coal adaptability, excessive gas emmission, ect, and ultimately creates great benefit for the customer and the society.
As to turbine reforming, RUNH can supply reform service to over *0 tupes of condensing, extraction condensing, direct air cooling and other steam turbines falling into five grades, **0mw/**0mw, **0mw, *0mw/*0mw and below. based on the theoretical research and mechnical engineering experiment. Our service can meet different requirements of thermal power plant, combined cycle power plant and industry waste heat recovery power plant.