FOB Price
Obtenir le dernier prix( Negotiable )
|Minimum Order
Localité:
Hebei, China
Prix de commande minimale:
-
Commande minimale:
1 Piece
Packaging Detail:
fit for container transport
Delivery Time:
60-90 days after order
Supplying Ability:
100 Piece per Year
Payment Type:
T/T, L/C, D/P
Personne àcontacter Mr. Felix
3km the south of Dongguang, Cangzhou, Hebei
(1) Effective Width: ***0mm****0mm
(2) Production speed: *****0meters/min
This line is the special equipment for corrugated board production. It may mainly includes mill roll stand, single facer, conveyor bridge, glue machine, double facer, slitter, cut-off, stacker and steam(or oil) heating system and glue preparing and supplying system.
We offer corrugated lines of advanced, medium and simple level, for single wall, double wall and triple wall board production, with speeds varying from *0m/min to **0m/min, widths available from ***0mm to ***0mm.