FOB Price
Obtenir le dernier prix|
Minimum Order
Localité:
China
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
T/T, L/C, D/A, D/P, Other
Personne àcontacter Yuguo
No.1, Float ShanHouCun, Shibei District, Qingdao, Shandong
Formaldehyde Plants Hengmao Provides
Flexible Processes
1) Off-Gas Circulation Process by our formaldehyde machine
Off-gas is used to take away the reaction heat instead of steam. Therefore, formaldehyde concentration is improved and steam is saved.
2) Flue Gas Circulation Process by our formaldehyde machine:
Flue gas resulted from off-gas incineration is employed to raise the yield as well as the run-up safety.
3) Incomplete Conversion Process
An excess of methanol is fed to reduce the reaction temperature and therefore our formaldehyde production line will lower the occurrence of side reactions as well as methanol consumption.
Low Consumption
1) Methanol Consumption: ******5 Kg/t
2) Power Consumption: *5 KWh/t
Product Quality of our Formaldehyde production line
1) Formaldehyde Content: *7%**2%
2) Methanol Content: 0.2%
3) Acidity: 0.*1%
4) *******0 Kg/t of steam as the by-product
Rational Plant Structure
The formaldehyde equipments include only 3 parts: Evaporator-Reactor-Absorber. Others are either combined into the three or removed.
Main Formaldehyde Equipments
Depending on different processes.