FOB Price
Obtenir le dernier prix|
Minimum Order
Localité:
-
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
-
Delivery Time:
immediate
Supplying Ability:
-
Payment Type:
-
Personne àcontacter Mr. Necdet
1843/2 sok. No:27 D:15, Izmir, Karsiyaka
Frequency: *0 Hz
Configuration: 6 sets of Typhoone Gas Turbines and 1 set of Steam Turbine (Siemens)
Total Capacity: *7.8 MWe
Year of commissioning in May ***3 and now all Units operate Actively at full capacity.
A steam turbine major maintenance and gas turbine units major maintenance of B-type were made in ***1.
After major maintenance, the turbine hours of operation within the range of *****0 hours A type of periodic maintenance of gas turbines are in right now(Due to annual maintenance period)
During the year ***1 major maintenance Also DCS system (Siemens simatic S7) version upgraded and equipment renovated during the year ***1 major maintenance.