Sell Grab By Henan Crane Co., Ltd., China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell Grab

Sell Grab

( Negotiable )

|

Minimum Order

Localité:

Henan, China

Prix de commande minimale:

-

Commande minimale:

1 Set

Packaging Detail:

naked + wooden box

Delivery Time:

15 working days after payment advance

Supplying Ability:

20 Set per Month

Payment Type:

T/T, L/C, Western Union

Contacter maintenant
Membre gratuit

Personne à contacter Mr. Jack

North Side of Xin-Chang Road, Xinxiiang, Henan

Contacter maintenant

Description

Brief Introduction

- Four-cable grab was mainly used along with overhead crane or gantry crane having two sents of hoist drum to grab various kind of material for loading, unloading, material transmission and related works.

Which can be designed as tooth type or under-water work according to its work condition

 

Working Principle

- There are two sets of lifting mechanisms on the crane, each of them leads two pieces of wire-ropes one of which lead the equalizer bar fixed on the upper crossbeam. Clip two ends of the equalizer bar to the greatest extent with wedge iron (exceptional ones shall be fixed on the fixed wheels in the middle of the upper pulley). Such a group of wire-ropes are used to rise and fall. The other one group LED separately from the middle of guide trolley is used to open and close. It works the way that the pulley block is formed by reeling from the traveling block on the fixed on the two ends pulley shaft and clipped with the wedge iron separately. It is used to open and close.

- At the beginning of work, the rising-falling together with the opening-closing wire-ropes lift the grab bucket to proper position, and then drop the opening-closing wire-ropes. At this time, the gravity of the lower crossbeam and that of the bucket bodies to open the bucket with center on the lower crossbeam axis, and the bucket body come to its max. Limit when the stopper of two ear plate collides. At that time, the center distance between pulley axis of fixed pulley on the upper crossbeam and the moveable pulley on the lower crossbeam will increase. Then, the rising-falling wire-ropes and opening-closing wire-ropes drop at same time to drop the grab bucket on the piled materials. Loosen the rising-falling wire-ropes and raise the opening-closing wire-ropes to raise the lower crossbeam pulley to the original position of axis center distance to the upper crossbeam pulley. The blade mouth plates of the two buckets shut then lift the opening-closing wire-ropes and rising-falling wire-ropes at same time to hoist the grab with full materials. The crane with trolley will carry the grab to the destination where the rising-falling wire-ropes

Not work, and the opening-closing wire-ropes will drop to open the two buckets, and the work unloading finished.

 

Main Technical Parameter

- Volume: From 1 to *0 m3;

- Type: It can be divided into light, middle and heavy type according to the material it will be grabed;

- Material gravity: It can be used for almost all material as coal, ore and so on;

- Weight of material to be grabed: The max. Weight of material to be grab is *0t, and we can design and manufacture according to your requirements;

- Pulley ratio: The pulley ratio of this type of grab can be 3, 4, 5 or 6;

- Number of rope for open-close: 2;

- Number of rope for hoist-lower: 2;

- Wire rope diameter: Changed from *4mm to *8mm, or according to your work requirements;

- Pulley diameter: Ranged from **0mm to **0 mm, or according to your work requirement;

- Times needed for open-close: About *4s;

- Max. Open size: From 1.8m to 5.0m;

- Other technical parameter: Other parameter can be designed and fabricated according to real requirements.

 

Manufacture Period

- Manufacture period for one set of such grab is *0 working days after receiving the payment advance;

 

Package and Transportation

- The four-cable grab can be transported by container, bulk cargo or train with main structure naked or covered by rain-proof clothes;

 