Sell plastic water cap mould By Taizhou Beiyi Electrical Technology Co., Ltd, China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell plastic water cap mould

Sell plastic water cap mould

( Negotiable )

|

Minimum Order

Localité:

taizhou city

Prix de commande minimale:

-

Commande minimale:

1 Set

Packaging Detail:

wooden case

Delivery Time:

30 days after payment

Supplying Ability:

100 Set per Month

Payment Type:

T/T, L/C

Contacter maintenant
Membre gratuit

Personne à contacter Ms. Yuko

No. 42 Yinshan Road, Huangyan District, Taizhou, Zhejiang

Contacter maintenant

Description


We are specilized in making plastic cap mould in China.

 


1. The cap mould is designed with 3D drawing and therefore the product yield rate is enhanced.

2. All parts are manufactured by the CNC equipment, so the precision of the spare parts is high, and the compatibility is good.

3. Each cavity having independent temperature control and heating system, keeps product with reliable and stable quality.

4. The cooling system of the cap mould’s cavity and core is one by one.

5. The mould cavity is replaceable, and it’s easy to change the shape.

 

 


Advantages:

1. Competitive price

2. Continuance service and support

3. Diversified rich experience skilled workers

4. Application expertise

5. Qualified, reliable and long product life

6. Mature, perfect and excellent, but simple design

 

 


1. Up to *2 Cavities

2. OEM Service Avaliable

3. Hot Runner System

4. High Grade Material of Mould Base and Core/ Cavity

 

 


1. Professional designs by 2D/3D drawings

2. Precise manufacture by CNC etc. equipments

3. Very good price with high quality

 


Process:

1. Quote competitive price according to customer’s detail requirement.

 

2. Sign agreement. 

 

3. Customer T/T deposit to us to start to design mould. 

 

4. Send mould drawing to customer for confirmation. 

 

5. Mould design confirmed and start to make mould. 

 

6. Make mould trial during tooling time (which we get agreement with customer) 

 

7. Send mould trial sample to customer for inspection or customer come to our factory to inspect mould personally.

 

8. Customer T/T balance to us after mould confirmed.

 

9. Delivery mould after get balance.

Send a direct inquiry to this supplier

To:

Ms. Yuko < Taizhou Beiyi Electrical Technology Co., Ltd >

Je veux savoir: