FOB Price
Obtenir le dernier prix( Negotiable )
|Minimum Order
Localité:
China
Prix de commande minimale:
-
Commande minimale:
1000 Piece
Packaging Detail:
by cartons
Delivery Time:
30 days
Supplying Ability:
100000 Piece per Week
Payment Type:
T/T, L/C, D/P, Western Union
Personne àcontacter Mr. Shaka
No.18, Feie Industrail Park, Zhongyi Village, Panyu District, Guangzhou, Guangdong, China, Guangzhou, Guangdong
Brass body material can be CW**7N, CW**2N, Hpb***1, Hpb***2, Hpb***3, etc;brass body superficial treatment can be tin-plating and nickel-plating.
Two sides with SUS**4 sleeve can connect the same size pipe by pressing of jaw to unite pipes together.
Production process: cutting brass bar ino different sections according to diferent product****-heating these sections in intermediate frequency furnace****-hot stamping****-cutting burr****-shot blast and shot penning****-mechanizing by meter lath and CNC****-inspecting **0%****-assembling****-testing and packing.
Special design assures **0% safety after assembling EDPM seal rings, SUS**4 sleeve and multilayer pipes.