FOB Price
Obtenir le dernier prix|
Minimum Order
Localité:
-
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
-
Delivery Time:
Immediate
Supplying Ability:
-
Payment Type:
-
Personne àcontacter Mr. Necdet
1843/2 sok. No:27 D:15, Izmir, Karsiyaka
"Waster Heat Recovery Boiler *1 ton/h saturated steam, operation pressure 8.5 bar"
Model No. TAURUS*0
Version ***1
I.D. No. ET*******-D
GP SN ***4T
POWER ***0 KW ISO Dry
Turbine RPM ****1
Base T5 Gas ***4
Liquid ***6
T5 Comp ********2
T5 Setpoint ***0
Vane Angle 5.0