FOB Price
Obtenir le dernier prix0.02 ~ 0.08 / Set ( Negotiable )
|Minimum Order
Localité:
Beijing,China
Prix de commande minimale:
Commande minimale:
300000 Set
Packaging Detail:
Carton
Delivery Time:
20-30days
Supplying Ability:
10000 Set per Day
Payment Type:
L/C, T/T
Personne àcontacter Ms. Shelly
NO.120,TAIFENG Large Building, Xi Cheng District,, Beijing, Beijing
Specification
Operation Procedures
1.Locating:After the thermal board is pasted onto the wall,choose
the fixing anchor position .
2.Drilling:Drill through the board,the hole depth must be according
to the specified measure(Note:The hole depth in the wall should be
over six cm)
3.Putting-in:Put the fixing plate around the put it into the
against the board.
4.Knocking-in:With a hammer,knock the steel nail into tube(steel
nail shall parallel to the thermal board)