FOB Price
Obtenir le dernier prix|
Minimum Order
Localité:
taian city ,shandong province ,china
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
5-7 containers
Delivery Time:
4months after signing contract
Supplying Ability:
-
Payment Type:
T/T, L/C
Personne àcontacter bob
gypsum industrial park, Taian, Shandong
At present, we
can design the production lines with annual output of **0,**0
m2, **0,**0 m2, **0,**0 m2, **0,**0 m2 and **0,**0 m2 and
etc., and there are several international specifications, such as
**6×**0×*0 ( hollow and solid ), **6×**0×**0( hollow and solid ),
**6×**0×**0( hollow and solid ), **6×**0×**0 ( hollow and solid ),
**6×**0×**0 ( solid ). We can also make different
specifications mould cavity as per client's requirements, which can
be exchanged in the same machine unit.