FOB Price
Obtenir le dernier prix5 ~ 10 / Square Meter ( Negotiable )
|Minimum Order
Localit:
shanghai
Prix de commande minimale:
Commande minimale:
1000 Square Meter
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
1000000000 Square Meter per Month
Payment Type:
T/T, L/C
Personne à contacter gang
Zhabei District Gonghexinlu 3088, Lane(Xiang Teng, Fortune Plaza, Room 1102, Building 7,), Shanghai, Shanghai
Floor Deck (steel bearing plate, construction steel sheeting) is
cold-formed of galvanized steel sheet by roll forming,
cross-section into a V-shaped, U-shaped, trapezoidal or similar
shape of these types of waveforms used as permanent
formworkalso
can be selected for other purposes.
(A) it is called:
Combination of floor, floor boards, steel bearing plate, pressure
plate, floor plate, the steel floor boards, the combination of
floor plate, galvanized steel bearing plates, galvanized floor
plate, galvanized floor boards, the combination of floor boards,
the combination offloor,
floor steel bearing plate, construction steel sheeting, composite
slabs, etc., are divided into: opening the floor boards, the whole
closed for floor boards, dovetail floor boards etc.
(B) the main
features:
1: to adapt to the rapid construction of the main steel structure,
to provide a firm platform for the job in a short period of time,
and can use more than one floor laying pressure plate, stratified
flow construction for pouring the concrete slab.
2: use the stage floor boards as a concrete slab tensile
reinforcement, but also improve the stiffness of the floor, saving
the amount of steel and concrete.
3: The pressure plate surface embossed to produce the greatest
binding force between the floor boards and concrete, so that the
two form an overall, together with the stiffener, so that the floor
plate system with high-strength bearing capacity.
4:
the conditions of the cantilever under the floor boards only as a
permanent template.Cantilever
the length of the section properties of the floor
boards.In
order to prevent the cracking of the cantilever plate, need the
supports of the Structural Engineers of the design coupled with
negative reinforcement.
5: the floor boards of the Company by the National fixed fire
extinguishing systems and fire-resistant component quality
inspection center fire resistance testing, as a combination of
floor boards do not need to fire the spray, thus greatly reducing
the project cost.
(C) Application:
The products are widely used in power plants, electrical equipment
company, car showroom, steel plant, cement warehouse, steel
structure office, airport terminals, railway stations, stadiums,
concert halls, Grand Theatre, a large supermarket, logistics
center, the Olympicvenues, sports venues and
other steel construction.
(D) of product testing
a dynamic loading test, qualified for floor boards is subject to
several groups of dynamic load test, draw the shear of the
composite board - bond coefficient, test out Even for the board and
concrete binding capacity obtained in the large
spanbear on the
design load.
b, fire test, the floor three groups in the fire-resistant
laboratory 1.5 hours, two hours and three hours to load fire test
for simultaneous measurement of temperature distribution within the
slab, test out Even Deck whether the insulation
requirements,refractory phase of
the positive moment resistance.
(E)
Floor Deck Construction and use
Profiles thick, floor boards, 0.*5mm, 0.8mm, 1.0mm, 1.2mm, 1.5mm
wide and **8mm ~ **8mm ~ **0mm ~ **0mm ~ **5mm ~ ***5mm high 5 1 mm
~ *6mm ~ *5mm long project requirements
customized.Engineering
floor mezzanine deck and reinforced concrete structure together,
the composite structure.Laying
floor boards to steel beam connections, the board ends and the
steel beam penetration welding, intermediate studs with steel beam
penetration welding; between the floor boards with special clamping
clamp occlusion pressure Kong connection; with special
pluggalvanized
plug boards and floor boards and steel beam
spot.If
it is with the arc of floor boards profiled cutting and plasma
cutting machine cutting, smooth the cut surface of galvanized layer
integrity.Floor
plate welding using manual arc welding electrode for the E***3,
3.2mm diameter, the penetration welding point is *6mm. The original
design of a pad pitch of **5mm after the solder is increased by 1,
to ensure that the operator walking floor boardsdeformation,
the end of pouring concrete when the floor boards slurry
leakage.When
the elevation change of floor layer structure is inconsistent, plus
welding steel measures taken, the level structure showed a step
transition, when the elevation of the lower I-beam webs plus
welding angle; uplift elevation joist flange and weld
channel.Encountered
floor reserved for the hole size is generally the first open hole
measures more than **0mm × **0mm, the increase in the steel beam
welding steel joists separated to increase the hole stiffness, mesh
reinforced disconnect in the hole, andwelding
steel; hole size of less than **0mm × taken **0mm when open hole
measures, namely the partition plate in the floor board to increase
the plug, mesh reinforced through, cut reinforced concrete pouring
molding
(F) Floor Deck
Installation Notes
Steel column gateway from the general 5 to 9.0m × 8 ~ *5m, the
secondary beam spacing of 3m, cutting the length of the floor plate
is 4.*7 ~ 8.*7m, transport and install than those in difficulties,
especially with vertical lifting floor from the arc
zonefor
the board, from top to bottom to wear in the secondary beam Hazama
sets is more difficult, and disrupted the normal beam welding
process.Control
the cutting length is 3 ~ 6m, you can avoid the problem of vertical
transportation between the secondary beams can not be
lifted.The floor board when
lifting using a dedicated soft sling.Each
lifting should check soft sling is torn, cut off
phenomenon.The floor boards
shelved on steel beams should be to prevent the
probe.Shop
materials, the operator should wear a seat belt, and to ensure that
the side laying the edge of fixed ropes in the perimeter
security.Welding
penetration spot welding, the welding should be prepared to scrap
arc test welding and adjusting welding current level templates and
vertical support for the bottom of the floor boards, cloth when
pouring concrete should not be too concentrated, the use of
flat-panel vibratorstimely assessed vibrators.