FOB Price
Obtenir le dernier prix( Negotiable )
|Minimum Order
Localité:
China
Prix de commande minimale:
-
Commande minimale:
1 Piece
Packaging Detail:
wooden case
Delivery Time:
15 days
Supplying Ability:
100 Piece per Week
Payment Type:
T/T, L/C, Western Union
Personne àcontacter Mr. Gary
No. 253, Xuanchun road, Sanzao industrial park, Pudong r, Shanghai, Shanghai
One.The heating way and technical parameter of teppanyaki equipment
  1.Electric magnet (more advanced and environment-friendly heating way, the main heating area can reach **0 degree Celsius within 3 minutes through electric magnet.)
  Electricity index: **0V/*0HZ 7.5KW , single- phase three- wire system
  2.Electric heating pipe
  Electricity index: **0V/*0HZ 7.5KW, three-phase and five-wire system
  3.Fuel gas (coal gas, liquefied petroleum gas, natural gas)
  Coal gas consumption: 9’caloric value ****0 2.*2 m3 /h
  liquefied petroleum gas consumption: 9’caloric value ***0 0.*5kg /h
  Natural gas consumption: 9’ caloric value ****0 1.2 m3 /h