FOB Price
Obtenir le dernier prix( Negotiable )
|Minimum Order
Localité:
China
Prix de commande minimale:
-
Commande minimale:
1 Piece
Packaging Detail:
wooden case for shipping
Delivery Time:
15 days
Supplying Ability:
100 Piece per Week
Payment Type:
-
Personne àcontacter Mr. Gary
No. 253, Xuanchun road, Sanzao industrial park, Pudong r, Shanghai, Shanghai
One.The heating way and technical parameter of teppanyaki equipment
  1.Electric magnet (more advanced and environment-friendly heating way, the main heating area can reach **0 degree Celsius within 3 minutes through electric magnet.)
  Electricity index: **0V/*0HZ 7.5KW , single- phase three- wire system
  2.Electric heating pipe
  Electricity index: **0V/*0HZ 7.5KW, three-phase and five-wire system
  3.Fuel gas (coal gas, liquefied petroleum gas, natural gas)
  Coal gas consumption: 9’caloric value ****0 2.*2 m3 /h
  liquefied petroleum gas consumption: 9’caloric value ***0 0.*5kg /h
  Natural gas consumption: 9’ caloric value ****0 1.2 m3 /h