FOB Price
Obtenir le dernier prix( Negotiable )
|Minimum Order
Localité:
Suzhou Fosita
Prix de commande minimale:
-
Commande minimale:
100 Piece
Packaging Detail:
standard export package
Delivery Time:
10 working days after receving down payment
Supplying Ability:
10000 Piece per Day
Payment Type:
T/T, L/C
Personne àcontacter Mr. Yongbing
Lefeng Road, Zhangjiagang City, Jiangsu
price list of PVC water supply pipe under Chinese and international standard | Chinese standard | international standard | |||
name | size | unit | wall thickness | price per meter | price per meter |
*0*0.6 | meter | 1.6 | 0.*2 | 1.*2 | |
*0*1.6 | meter | 2 | 1.*0 | 1.*9 | |
PVC water supply pipe | *5*0.6 | meter | 1.6 | 1.*8 | 1.*5 |
*5*1.6 | meter | 2 | 1.*3 | 1.*0 | |
*2*0.6 | meter | 1.6 | 1.*7 | 2.*1 | |
*2*1.*5 | meter | 2 | 1.*9 | 2.*8 | |
*2*1.6 | meter | 2.4 | 2.*1 | 3.*0 | |
*0*0.6 | meter | 1.6 | 2.*4 | 2.*4 | |
*0*1.0 | meter | 2 | 2.*3 | 3.*5 | |
*0*1.6 | meter | 3 | 4.*0 | 4.*9 | |
*0*0.6 | meter | 1.6 | 2.*7 | 3.*0 | |
*0*1.0 | meter | 2.4 | 3.*5 | 4.*3 | |
*0*1.6 | meter | 3.7 | 6.*4 | 7.*9 | |
*3*0.6 | meter | 2 | 4.*4 | 5.*5 | |
*3*1.0 | meter | 3 | 5.*9 | 7.*5 | |
*5*0.6 | meter | 2.2 | 5.*9 | 6.*3 | |
*5*1.0 | meter | 3.6 | 7.*6 | *0.*4 | |
*0*0.6 | meter | 2.7 | 7.*5 | 9.*6 | |
*0*1.0 | meter | 4.3 | *0.*8 | *5.*5 | |
**0*0.6 | meter | 3.2 | *1.*1 | *4.*5 | |
**0*1.0 | meter | 4.8 | *6.*0 | *0.*0 | |
**0*0.6 | meter | 4.7 | *8.*0 | *0.*1 | |
**0*1.0 | meter | 7 | *1.*0 | *4.*2 | |
**0*0.6 | meter | 5.9 | *4.*7 | *7.*9 | |
**0*1.0 | meter | 8.7 | *4.*9 | *8.*8 | |
**0*0.6 | meter | 7.3 | *8.*5 | *3.*2 |