FOB Price
Obtenir le dernier prix30 / Piece
|Minimum Order
Localité:
china
Prix de commande minimale:
Commande minimale:
100 Kilogram
Packaging Detail:
The film should be provided in rolls and wound up to the pipe core
Delivery Time:
in 14days after receive payment or L/c
Supplying Ability:
300 Ton per Year
Payment Type:
-
Personne àcontacter dolly
Liubao Industrial Zone, Yangzhou, Jiangsu
Scope:
The polyimide film is produced by adopting "Biaxial Tension Process" with a width larger than 1 meter, its all performance indexes are better than polyimide film produced by "Aluminum Foil Process" "Doctor-balding Process". It possesses heat-resistant, radiation-resistant and excellent dielectric as well as physical performance and applies to motor Grade H.O. electric insulation and electrical engineering insulating material for other purpose.
I. Technical requirement
1. Appearance: Smooth and bright film surface. The defects of folding, broken, particulate air bubble, pinpoint and foreign impurities, tidy edges and non-damage the film provided in rolling.
2.(The place is not enough, if you have some inquire please email or fax me)
â…¡. Packing, Mark, Preservation and Transportation
1. The film should be provided in rolls and wound up to the pipe core, each roll is well packed and loaded with plastic bag to be placed into dry and clean box.
2. The each box packing should be marked with the type, product specification, size, lot number, gross weight, net weight, date of manufacture, name of the manufacturer and the product acceptances certificate is attached. At the same time the painting words of Damp-proof collision-proof etc.
3. The should be pressured in dry and clean room, the preservation period from the date of production is two years and can still be used when it is qualified in case of the preservation period is exceeded and checked according to standard./
4. During the preservation and transportation, damping and mechanical damage should be avoided.
III.specifications︰
specifications︰
|
***2: |
Payment Details︰ |
T/T in advance or L/C at sight |
Min Order︰ |
**0kg |
Ship Date︰ |
in *4days after receive payment or L/c |