FOB Price
Obtenir le dernier prix( Negotiable )
|Minimum Order
Localité:
CHINA
Prix de commande minimale:
-
Commande minimale:
1 Piece
Packaging Detail:
wooden case
Delivery Time:
50days
Supplying Ability:
100 Set per Month
Payment Type:
PayPal, Western Union, T/T
Personne àcontacter Ms. Juicy
Western mould city, Huangyan, Taizhou, Zhejiang
1.Cavity:**4
2. Mold Material: P*0
3. Runner: cold runner
4. Delivery time: *0 days
5. Design software:UG, PROE, CAD
6. Mould base: home made mould base
7. Mould life: above **0,**0 shots
8. Package: wooden cases or according to customers requirement.
The proceeding of processing
Step 1. Samples/drawing & requirements from you
Step 2. The sheet will be copied to our design department,tooling
department to do the structure and feasibility analysis
Step 3. Before start mould design, the tooling schedule and
processing sheet were done.
Step 4. Mould design:at the same time we will communicate &
exchange the opinions with you.
Step 5. Material purchase:steel cutting and mould base tooling.
Step 6. Inspection of mould:our processing manager are following
and controlling the tooling processing.
Step 7. Mould testing:we will inform you the date,then will send
you the samples inspection report & injection parameters with
the sample to you.
Step 8. Ready to ship out.
Any questions, please feel free to contact. We will be waiting for
you here.