FOB Price
Obtenir le dernier prix50000 / Piece
|Minimum Order
Localité:
China
Prix de commande minimale:
Commande minimale:
1 Piece
Packaging Detail:
Nude package
Delivery Time:
10 days
Supplying Ability:
-
Payment Type:
D/P, L/C, T/T
Personne àcontacter Ms. nancy
shangcheng Road, Shanghai, Shanghai
Model |
Vehicle Type |
Driving |
Engine |
P(kW) |
Wheel Base |
GVW |
Cab |
Emission |
Chassis |
ZZ***7N***7W |
Concrete pump truck chassis |
6×4 |
WD**5.*9 |
**7 |
***0****0 |
****0 |
HW*6 |
Euro2 |
******3 |
ZZ***7S***7W |
Concrete pump truck chassis |
8×4 |
WD**5.*7 |
**3 |
***0****0****0 |
****0 |
HW*6 |
Euro2 |
******2 |
ZZ***7M***7W |
Fuel tanker chassis |
8×4 |
WD**5.*2 |
**6 |
***0****0****0 |
****0 |
HW*6 |
Euro2 |
******2 |
ZZ***7N***7C |
Concrete pump truck chassis |
6×4 |
WD**5.*5 |
**7 |
***0****0 |
****0 |
HW*6 |
Euro3 |
******5 |
ZZ***7S***7C |
Concrete pump truck chassis |
8×4 |
WD**5.*6 |
**6 |
***0****0****0 |
****0 |
HW*6 |
Euro3 |
******4 |
ZZ***7N***8W |