FOB Price
Obtenir le dernier prix1 / Piece
|Minimum Order
Localité:
China
Prix de commande minimale:
Commande minimale:
1 Piece
Packaging Detail:
Standard export packing. Cotton covered outside.Heat shrinkable film inside,
Delivery Time:
7 days after deposit
Supplying Ability:
10000 Piece per Day
Payment Type:
T/T, L/C
Personne àcontacter Cathy
highway exit, three dongqiao,, Linhai, Zhejiang
1.Plastic parts: made in the imported LLDPE with automatic rotate plastic machine,anti-UV,anti-static,anti-crack
2.Metal parts: made in the national standard steel pipe,welded by the industrial robot,strong and smooth
3.Deck: use the automatic punching machine,skid-proof,water-proof
4.Painting: use the painting flow line machine,well-mixed
5.Certifications: ISO***1 and CE
6.Honorary: Chinese well-known trademark,Chinese outstanding entrepreneur,well-selling award of the China International Sporting goods show and ect
7.Usage: residential zone,theme parks,supermarkets,educational organizations and ect.