Sell Mould, side plate , hardening car By Henan Good Heavy Machinery Manufacture Co., Ltd, China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell Mould, side plate , hardening car

Sell Mould, side plate , hardening car

|

Minimum Order

Localit:

China

Prix de commande minimale:

-

Commande minimale:

1 Set

Packaging Detail:

packing in container, bulk or nude

Delivery Time:

within 30 days

Supplying Ability:

10 Set per Month

Payment Type:

T/T, L/C

Contacter maintenant
Membre gratuit

Personne à contacter faier

Zhengzhou, Henan

Contacter maintenant

Description


【Introduce】
When combined, mould and side board can be used to contain slurry, after static curing ,foaming ,we get the cake . furthermore, side board holds the cake to the
cutting machine and be sent into the autoclave together with the steam curing cart for steam curing the cake.


【Productive Process of Aerated Concrete】
(1).Production Process of Aerated Concrete According to the category and quality of raw material, and the features of equipment, the aerated concrete can be manufactured in different processes. Generally, add water to ash, silica sand or slag and crush them into slurry;
 (2) . Then add powdery lime, cement of right amount, plaster, vesicant, foam stabilizer, and mix and pour it to mould frame;
(3).After curing, foaming and hardening, cut it into blocks and boards in different specifications;
 (4).Finally, transport it into pressure steamer with steam-curing cart, and get the light cellular concrete after steam-curing with high temperature and pressure.

【Process Flow of an Annual Output *0,**0m******0,**0m3 Aerated Concrete Steam-Curing Production】

(1) Various raw material storage tanks → (2) Mix dosing → (3) add water to raw material and mix them → (4) prepare the mould → (5) pour → (6) foam and wait → (7) release from mould → (8) turn up, cut horizontally and vertically → (9) make into groups and get into autoclave → (*0) cure under high temperature and pressure → (*1) release the finished products from the autoclave → (*2) test the finished products → (*3) pack → (*4) stack and store up → (*5) leave the factory.
 

Send a direct inquiry to this supplier

To:

faier < Henan Good Heavy Machinery Manufacture Co., Ltd >

Je veux savoir: