FOB Price
Obtenir le dernier prix|
Minimum Order
Localit:
China
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
packing in container, bulk or nude
Delivery Time:
within 30 days
Supplying Ability:
10 Set per Month
Payment Type:
T/T, L/C
Personne à contacter faier
Zhengzhou, Henan
ã€Application fields】
(1)The
machine may be used for branches such as chemical industry ,
building material , machinery , coal ,metallurgy , light industry
, grain , medicine , traffic , water and electricity broadly,
(2)Being used to transport all kinds of form of powder and small
piece material. Be inadvisable to transport
the big viscidity packing
material or large piece of material easy to go
bad.
ã€Features】
(1)Structure is simple ,
(2)Operation safety is convenient, the upkeep is not very
complicated, the cross section external form the dimension is
not big ,
(3)Easy to carry out load-off on some location, confinement machine
shell cover may reach fairly good hermetic
sealing.
ã€Productive Process of Aerated Concrete】
(1).Production Process of Aerated Concrete According to the
category and quality of raw material, and the features of
equipment, the aerated concrete can be manufactured in different
processes. Generally, add water to ash, silica sand or slag and
crush them into slurry;
(2) . Then add powdery lime, cement of right amount, plaster,
vesicant, foam stabilizer, and mix and pour it to mould frame;
(3).After curing, foaming and hardening, cut it into blocks and
boards in different specifications;
(4).Finally, transport it into pressure steamer with
steam-curing cart, and get the light cellular concrete after
steam-curing with high temperature and pressure.
ã€Process Flow of an Annual Output *0,**0m******0,**0m3 Aerated Concrete Steam-Curing Production】
(1) Various raw material storage tanks → (2) Mix dosing → (3) add water to raw material and mix them → (4) prepare the mould → (5) pour → (6) foam and wait → (7) release from mould → (8) turn up, cut horizontally and vertically → (9) make into groups and get into autoclave → (*0) cure under high temperature and pressure → (*1) release the finished products from the autoclave → (*2) test the finished products → (*3) pack → (*4) stack and store up → (*5) leave the factory.