Sell Decorative Mineral Fiber Ceiling Panels By Hebei borunde building materials co., ltd, China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell Decorative Mineral Fiber Ceiling Panels

Sell Decorative Mineral Fiber Ceiling Panels

1.0 ~ 5 / Square Meter

|

Minimum Order

Localité:

Hebei,China

Prix de commande minimale:

Commande minimale:

5000 Square Meter

Packaging Detail:

10-20 pcs per carton

Delivery Time:

within 10 days

Supplying Ability:

50000 Square Meter per Day

Payment Type:

L/C, T/T, Western Union

Contacter maintenant
Membre gratuit

Personne à contacter Sam

Tanan road, Shijiazhuang, Hebei

Contacter maintenant

Description

Decorative Mineral Fiber Ceiling Panels

Standard sizes:**0mmx**0mm/**0x***0mm

*4"x*4"/*4"x*8"

thickness: ***2mm

Edge detail:  

1. Angled Tegular

2. Beveled Tegular

3. Suqare Lay-in

4. Normal Concealed and exceed concealed

Surface pattern:Different designs avaliable.

Physical data

1. Raw materials:Wet-formed mineral fiber

2. Surface finish:Factory-applied vinyl latex paint

3. Fire performance :China B1 grade(meet GB********7)

4. Density:******0kg/m3 

5. Content of Recycled material:*5%~*5%

6. NRC(Noise reduction coefficient): 0.*5                         

7. CAC(ceiling attenuation class): *5                

8. Light Reflectivity: Minimum 0.*5

9. RH:*0,*5,*0

Feature   

1. High light-reflectance

2. nondirectional pattern designed ,easy installation

3. Fire-resistance

4. Adopt high quality mineral wool,**0% asbestos-free

5. light-weight and easy to be cut.

6. Withstand condition with  relative humidity up to *9%.

7. Excellent sound absorption ability and competitive price.

8. Excellent ability of sag-resistance

Installation: When the building is dry enough and chemical 
gas disappears ,installation can be started.Make sure the 
temperature doesnt exceed *9
C and relative humility not 

exceed *9%.

Transportation and storage:When transporting,take care 
of the edge of the board.It will be better to lay the panels on
 dry backing-plate horizontally,about one meter away from the wall.


Send a direct inquiry to this supplier

To:

Sam < Hebei borunde building materials co., ltd >

Je veux savoir: