brass wiring terminal XG008 , 6x9 By Yueqing Xingong Electric Factory, China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
brass wiring terminal XG008  , 6x9

brass wiring terminal XG008 , 6x9

0.2 / Piece

|

Minimum Order

Localité:

Zhejiang, China (Mainland)

Prix de commande minimale:

Commande minimale:

200 Piece

Packaging Detail:

Export neutral packing

Delivery Time:

3-30 days

Supplying Ability:

500 Piece per Day

Payment Type:

T/T

Contacter maintenant
Membre gratuit

Personne à contacter Ms. Bonnie

Qiaohou Village, Xiangyang Town, Yueqing, Zhejiang

Contacter maintenant

Description

Material :    
Brass bar,high strength and hardness,wear-resisting property high,chemical resistance good .Natural, Nickle Plated, Tin Plated or any coating .(Hpb***3 or Hbp***2.5) Screw,high quality steel (Iron) ,surface : yellow zinc,nickle,white zinc  OEM Service Offered,Buyer Label Offered , we can offer samples or the drawings to   process production according to the customer, supply different size,such as ,different  length ,width,hole diameter. According to your drawings,requirements or specifications We are specialized in brass terminals,brass terminal,  terminal block ,link bar etc. for 7 years.  Tolerance:±0.3mm Only parts of the products are listed above, please visit our web,contact us for detailed info. a)Minimum order: ***0 USD (by sea or by air) ,and mixed order is available,                                    Unlimited by EXPRESS   (DHL,UPS,TNT...) b)Payment :  a.**0% TT  in advance .(Order less than ***0 USD)                          b.*0%   TT in  advance,*0% TT before delivery                          c.*0%   TT in advance,the balance against the copy of B/L at sight                          d.Other is available   c)Delivery time:  ***0  days  after received receipt of deposit. 

Send a direct inquiry to this supplier

To:

Ms. Bonnie < Yueqing Xingong Electric Factory >

Je veux savoir: