FOB Price
Obtenir le dernier prix55 / Piece
|Minimum Order
Localité:
Shandong, China (Mainland)
Prix de commande minimale:
Commande minimale:
24 Piece
Packaging Detail:
PALLET
Delivery Time:
within 15 days after receiving formal order
Supplying Ability:
50 Piece per Week
Payment Type:
Western Union, L/C, T/T
Personne àcontacter Ms. Linda
NO.21 ROOM 405,4th FLOOR, EAST ROAD SHENGQUAN, LAISHAN DISTRICT, Yantai, Shandong
We can supply Sprocket,Bottom roller,Top roller,Idler for Crawler crane.
Bottom rollerfor Crawler Crane:
Package & Delivery:
Package: Pallet
Delivery: within ****0 days after receiving formal order
Specifications:
Materila: *5SiMn,*5SiMnMo
Warranty: one year / ********0 hours
Abundant casting technology,High Quality
Suitable for Model | |||||
HITACHI | |||||
KH**0 | KH**5 | KH****2 | KH****2 | KH****2/3 | KH****2 |
KH****2 | KH****2 | CX**0 | CX**0 | CX**0 | CX**0 |
SUMITOMO | |||||
SC**0 | SC****2 | SC****2 | SC**0 | SC****2 | SC***0 |
SC****2 | SC*****2 | LS*8 | LS**8 | LS**8BSS | LS**8RH5 |
LS****3 | LS**8RH5 | LS**8 | LS**8 | LS**8 | LS**8 |
IHI | |||||
CCH**0 | CCH****2 | CCH****3 | CCH***0E | DCH**0 | |
KOBELCO | |||||
P&H**5 | P&H**0 | P&H****1 | P&H****2 | P&H***5 | P&H***5 |
P&H***5 | P&H***5 | P&H***5 | P&H***0 | P&H***0 | |
FUWA | |||||
QUY *****0 ton | |||||
XCMG | |||||
QUY *****0 ton | |||||
SANY | |||||
SCC *****0 ton | |||||
OTHER MODEL | |||||
DH**8 | DH**8 | CH**0 | CKE***0 | CC***0 | SCX***0 |
Note: we can also produce them according clients drawings and requirements.