Cement Production Line By Beijing Zhongye Chuangxin Metallurgy Mine Technology Co., Ltd, China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Cement Production Line

Cement Production Line

|

Minimum Order

Localité:

China

Prix de commande minimale:

-

Commande minimale:

-

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

-

Payment Type:

PayPal, L/C, T/T

Contacter maintenant
Membre gratuit

Personne à contacter Li

Room 1106, Building 2, Soubao Business Center, No. 16 South San Huan, Beijing, Beijing

Contacter maintenant

Description

SKU:Crusher**2
Raw materials extraction (mining) → crushing→ raw materials storage and pre-homogenization (ball mill) →raw material homogenization and storage, calcinations (raw material enter into rotary kiln after pre-heater in cyclone tube, calcinated to clinker) → cement grinding (mix other chemical material according to cement quality to grind) → cement storage and transportation This is a simplified process of cement production. Our company can supply almost all the equipments in all the necessary section of this line.

Cement manufacturing consists of raw material grinding, blending, pre-calcining, clinker burning and cement grinding. In short, limestone and other materials containing calcium, silicon, aluminum and iron oxides are crushed and milled into a raw meal. This raw meal is blended and then heated in the pre-heating system(cyclones) to start the dissociation of calcium carbonate to oxide. The meal goes further into the kiln for heating and reaction between calcium oxide and other elements to form calcium silicates and aluminates at t a temperature up to ***0 centidegree: so called clinker burning. The cyclone system is attached to the rotary kiln by a riser duct. Secondary fuel is fed to the riser duct, the main fuel mixture, coal/petcock, fires the kiln. Reaction products leave the kiln as a nodular material called clinker. The clinker will be interground with gypsum and other materials to cement.

The equipments we use in this whole production line arevibrating feeder, jaw crusher, impact crusher, cement ball mill,lifter,preheating system, cement rotary kiln and packing machine and so on. All the necessary equipments in this line can be provided by our factory.


After shipping the equipments to destination, if you need help in the installation of all the equipments, we can send our engineers to help settle the whole line!



Send a direct inquiry to this supplier

To:

Li < Beijing Zhongye Chuangxin Metallurgy Mine Technology Co., Ltd >

Je veux savoir: