FOB Price
Obtenir le dernier prix|
Minimum Order
Localit:
-
Prix de commande minimale:
-
Commande minimale:
1 Set
Packaging Detail:
According to the actual requirments
Delivery Time:
Within 30 days receiving the deposit or L/C
Supplying Ability:
100 Set per Year
Payment Type:
T/T, L/C
Personne à contacter Mr. Anderson
RM1816 Huanhai Mansion, No. 2, Donghai (M) Road,, Qingdao, Shandong
1 Briefing and Honor
1.1 Set up in ***6,
1.2 Belonged to the former Ministry of Machinery Industry,
1.3 Belongs to Academy of Machinery Science and
Technology***-Corp. Group administrated by the central
government,
1.4 has devoted in design, development and manufacture of
vacuum furnaces for more than *0 years, and has provided more than
***0 sets,
1.5 Now has the series products of *7 types over **0 models,
and annual vacuum furnace output reached **0 sets,
1.6 Vacuum Furnace products exported to Turkey, South Korea,
Japan, Malaysia, Indonesia, Pakistan, Myanmar, Syria, Korea,
Vietnam and other countries,
1.7 National Technology support in vacuum heat treatment field
authorized by China Science and Technology Ministry in ***7,
1.8 Recommendation product of China Aviation system from
***0,
1.9 Recommendation product of China Heat Treatment Association
from ***2.
1.*0 R&D in Vacuum Carburizing & Quenching equipment
and process field from ***0s, technological leadership in
China.
2 Main technical parameters
2.1 Horizontal type, two chamber, front loading
2.2 Highest Temperature: ***0℃
2.3 Effective dimension:
**0(W)×**0(L)×**0(H)mm
2.4 Max. Loading: **0 kg
2.5 Temperature uniformity: ±5℃(**0℃ã€***0℃,5
points testing,without loading)
2.6 Ultimate vacuum: 4×***1Pa
2.7 Vacuum leak up rate: ≤5.0×***1Pa/h
2.8 Heating time:≤*0min (To ***0℃ with load)
2.9 Transfer time for quenching: ≤*5Sec
2.*0 Heating power: *0kW
2.*1 Total power: *0kW
2.*2 Cooling water:7m3/h
2.*3 Control system :Touch panel, PLC controller, PID
temperature controller
2.*4 Vacuum system: Mechanical pump, Roots pump
3 Vacuum Furnace Detail Specification
3.1 Furnace construction:
3.1.1 Horizontal type with two chamber, heating chamber and
quenching chamber.
3.1.2 Vacuum chamber is double-wall structure, made by quality
Q**5 carbon steel or **4 stainless steel board. Between
double-walled use cooling water force cooling.
3.1.3 Furnace door use two-way sealed pneumatic fast-open
structure, easy for operation.
3.1.4 Observation window on two chamber and lamp in quenching
chamber.
3.1.5 Air evacuation valve, cooling gas pressure control
device in quenching chamber. Vacuum meter, pressure control device
and temperature uniformity test hole on heating chamber.
3.1.6 O-ring seal ring.
3.1.7 Temperature Controller and Alert thermocouple easy for
installation and maintenance.
3.1.8 Appropriate Port for Temperature Uniformity Test.
3.1.9 Circulation Water Pipe, with Water Flow monitors.
3.2 Heating components
3.2.1 Heating Elements: Graphite bar. Graphite heating
elements, convenience for maintenance.
3.2.2 Thermal Insulation Shield: Graphite structure. Many
layers of Soft carbon felt (*0mm). Easy for clean and long
life.
3.2.3 High quality Shell for Insulation Shield.
3.2.4 Separable and removable Thermal Insulation shield, easy
for maintenance
3.2.5 water-cooled Copper electrode, Convenience for
Maintenance
3.3 Thermal gate valve
3.3.1 Located between heating chamber and quenching chamber,
with seal and heat insulating properties.
3.3.2 O-ring seal ring.
3.3.3 Pneumatic vertical open and close, easy for
operation.
3.3.4 Water cooled.
3.3.5 High reliability.
3.4 Gas-cooling System
3.4.1 Inert Gas: N2 or other inert gas
3.4.2 Maximum Operating Pressure: 1.*9bar
3.4.3 Cooling Fan Motor
3.4.4 Modules Design for cooling Fan and Motor, which can
directly disassemble from the top of furnace
3.4.5 High Efficiency Cooper Finned-tubes Heat Exchanger
3.4.6 Cooling gas pressure can be controlled:
3.4.7 Safety Valve
3.5 furnace inside charging mechanism
3.5.1 Front and back movement to transfer working piece
between heating chamber and quenching chamber.
3.5.2 Slow-fast-slow mode movement to keep move smoothly.
3.5.3 Charging mechanism does not down into quenching oil,
keep clean. Prevent pollution of heat chamber.
3.6 Quenching mechanism
3.6.1 Upward and downward movement to transfer working piece
into quenching oil.
3.6.2 Slow-fast-slow mode movement to keep move smoothly.
3.7 Quenching oil control
3.7.1 Oil temperature heating control system, to keep oil in
the best temperature.
3.7.2 Oil cooling device, heat exchanger.
3.7.3 Oil agiter and guidance device
3.7.4 High reliability
3.8 Control System
3.8.1 Touch Operation Flat Panel: (*5, China)
3.8.1.1 Easy operation and user friendly
3.8.1.2 Diagram operation display
3.8.1.3 Heating program and quenching program display
3.8.1.4 Display alert detail
3.8.1.5 With operation guide
3.8.1.6 Display pipe and valve statues
3.8.1.7 High reliability
3.8.2 Programmable Logic Controller (PLC) : CP1H (OMRON,
JAPAN)
3.8.2.1 Automatic operation
3.8.2.2 Program writing and correcting easily
3.8.2.3 High reliability
3.8.3 Temperature Controller:FP*3 (SHIMADEN, JAPAN)
3.8.3.1 High precision, high reappearance: ±0.1%
3.8.3.2 6 sets PID automated adjustment function
3.8.3.3 Store *0 set program, and the program can be added to
**0sets
3.8.3.4 High reliability
3.8.4 IT Recorder and Alert: EX***0(YOKOGAWA, China-Japan)
3.8.4.1 Record temperature and vacuum pressure signal
3.8.4.2 Without paper, use IT store function
3.8.4.3 Provide over-temperature alert
3.8.4.4 High reliability
3.8.5 Thermocouple: S-type 2Pcs
3.8.6 Thermocouple: appropriate leak proof devices, with
protection tube.
3.8.7 Heater: installation with voltmeter and ampere meter
3.8.8 Main Power supply: installation with ampere meter
3.9 Vacuum system
3.9.1 Mechanical pump:2X**0 (China)
3.9.2 Roots pump: RTO.**0S (China)
3.9.3 Vacuum gauge: ZDZ**2T (China)
3.9.4 Vacuum valve (STONE, China Taiwan)
3.*0 Peripheral Device(Supply by Buyer)
3.*0.1 Cooling water pressure:2kg/cm2
3.*0.2 Cooling water consumption: no less than 7 t/h, inlet
water temperature between 5℃~*5℃.
3.*0.3 Emergence water supply: Directly Water Supply to
cooling system
3.*0.4 Compress Air: **6kg/cm2
3.*0.5 Power Require: 3Prase, **0V, *0Hz, *0KW
3.*0.6 Vacuum quenching oil: 5 barrel (**0kg for each
barrel)
4 One Year Guarantee
5 Technical Data
5.1 Operation and maintenance manual
5.2 Data book and certificate of quality of main devices.
5.3 Principal drawing and wiring diagram of electrical
control.
5.4 Main assembly drawing, parts drawing of furnace liner,
machining drawing of easy damaged parts.
5.5 Groundwork drawing of furnace installation.
5.6 Spare parts listing, technological item check report,
encasement listing.
6 Paint
6.1 The out shell of the vacuum chamber and other components
of the furnace shall be printed and then finished with two coats of
industrial paint,
6.2 All components shall not be pained until after finial
disassembly.
7 Installationã€Adjustment and Accept
7.1 Plane drawing and groundwork drawing are provided before
construction. The provider checks construction quality. Cooperating
with the user, the provider takes charge of the installation and
adjustment, and the quality of installation is checked and accepted
by the user.
7.2 Sequence of checking and accepting
7.2.1 User sends person to providers spot shop for
pre-checking. Pre-checking points is checked by device technical
spec and requirements before delivery. Since pre-checking report is
signed by double sides, furnace would be send from factory. At the
same period, technique training is provided to the user.
7.2.2 Final accepting is operated and reaches the normal
requirement, after user informs the provider, or the furnace is
arrived at the users local a week. Installation is in the charge of
the provider cooperating with the user. After the accepting device,
both sides subscribe accepting report.
8 Technical Training
The provider takes charge of the training of operation and
maintenances to the user. After the training, the engineer of the
user could operate accurately and independently. At the time of
pre-checking, the provider also gives technical training for the
user (operation worker, mechanical maintenance worker, and
electrical maintenance worker).