Family size, small size, household, domestic biogas system By SHENZHEN PUXIN TECHNOLOGY CO. LTD, China
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs. Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Family size, small size, household, domestic biogas system

Family size, small size, household, domestic biogas system

|

Minimum Order

Localit:

SHENZHEN

Prix de commande minimale:

-

Commande minimale:

1

Packaging Detail:

-

Delivery Time:

wthin 10 working days

Supplying Ability:

1000

Payment Type:

-

Contacter maintenant

Personne à contacter Mr. Vane

1-2nd floor, Bldg 4, Masha Xuda High-tech. Industry Park, 49 Jiaoyu North Dd, Gaoqiao, Pingdi , Long, Shenzhen, Guangdong

Contacter maintenant

Description

2ï&frac*4;ŽIntroduction of Puxin family size biogas plant Puxin family size biogas system is composed of a 6 or *0 m3 Puxin family size biogas plant, pipe routes, and gas purify devices and gas appliances or small power biogas generator. Puxin family size biogas system is mainly applied to farmhouse or domestic house to treat livestock waste, straw, human sewage and food waste. Puxin 3 in 1 model family size biogas plant applied in farmhouse (1) The structureï&frac*4;š Puxin family size biogas plant is composed of a concrete digester and a glass fibre reinforced plastic gas-holder. The digester is 6 or *0 m3 of capacity. The gas-holder is 1.6 m of diameter, 0.6 m of height and 1 m3 of capacity. ï&frac*4;ˆ2ï&frac*4;‰The features ï&frac*4;š  Easy and quick to be built  Highly industrialized  Solid organic material (straw and grass etc.) can be used  Easy to maintain  Durable  Excellent safety feature  Low cost 1ï&frac*4;‰Easy and quick to be builtï&frac*4;š  Any working mason through one day’s study is able to build Puxin family size biogas plant with **0% success rate.  A Puxin family size biogas plant can be built within *8 hours. Contrast of the technical requirements for the builders Items Traditional fixed dome biogas plant Puxin biogas plant Airtight craft Highly required Not required Ability to understand blueprints Highly requiredï&frac*4;ˆbuild by hand depending the blueprintsï&frac*4;‰ Not required (cast by mould) Ability to build the arch Highly required (build by hand) Not required (cast by mould) To judge and deal with gas leaking Highly required Lowly required To judge and deal with water leaking Highly required Required Training period About 3 month About one week Period to become a proficient builder 1ï&frac*4;2 years About one month Requirement of the people to be trained Medium educated, strong ability to master skills Not Educated, medium ability to master skills Success rate Not **0ï&frac*4;… guaranteed **0ï&frac*4;… guaranteed 2ï&frac*4;‰Highly industrializedï&frac*4;š  Fit for cosmically and fleetly spread: The steel mould and the gas-holder can be mass-produced in factory. So, the biogas plant can be cosmically and fleetly built.  Quality of the biogas plant is highly guaranteed. Every digester duplicated by the steel mould can fit every gas holder duplicated by mold. 3ï&frac*4;‰Solid organic material (straw and grass etc.) can be used Traditional fixed dome biogas plant Puxin biogas plant Fluidities (like animal wastes) Allowed Allowed Solids (like straw and grass) Not allowed (because of the difficulty to replace solid fermentation material ) Allowed (convenient to replace solid fermentation material) 4ï&frac*4;‰Easy to maintain Items The traditional fixed dome hydraulic biogas plant The Puxin Biogas plant To mend the gas leak of gas-holder Dangerous and difficult The job is done inside the biogas digester; there is a possibility of poisoning. The leak can not be found. Safe and easy The job is done on ground; there is no possibility of poisoning. The leak can be seen, and can be mended directly. To mend the water leak of the digester Dangerous The digester’s outlet is too small that the air circulation in the digester is bad. So, there is a possibility of poisoning. Safe The digester’s outlet is large enough that the air circulation in the digester is good. So, there is no possibility of poisoning. 5ï&frac*4;‰Durableï&frac*4;š The concrete digester can last over thirty years. The glass fibre reinforced plastic gas-holder can last over ten years. When the gas-holder is worn-out, a new one can replace. So the Puxin biogas plant can last over thirty years. 6ï&frac*4;‰Excellent safety featureï&frac*4;š There is no possibility of biogas poisoning to the users. When the gas-holder is taken out from the digester, there is no biogas left in the digester. The digester’s outlet is 1.5m in diameter that is large enough to keep sufficient fresh air in the digester. So, it is safe to repair the digester, and safe to replace fermentation material. 7ï&frac*4;‰Low cost The cost to build Puxin biogas plant is lower than cost to build traditional Chinese fixed dome biogas plant and much lower than the cost to build Indian floating gasholder biogas plant. Family size, small size, household, domestic biogas system

Send a direct inquiry to this supplier

To:

Mr. Vane < SHENZHEN PUXIN TECHNOLOGY CO. LTD >

Je veux savoir: