FOB Price
Obtenir le dernier prix|
Minimum Order
Localité:
-
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
-
Personne àcontacter Mr. Sunny
4F.Building 9, Jiu-Xiang-Ling Industrial Park, shenzhen, Guangdong
Project Location:Tsinghua University, Shenzhen Graduate School. China Construction time:Dec. ***9 Project Introduction:power of solar PV modules:*3kW solar grid-connected inverter model:GB***0B*3. The solar trees are built on the glass of the landscape to form the solar power forest to absorb the energy from the sun and part of the power is transmitted to the power grid while the other part is stored for the power of public facility of the school. Annual output of generated electricity :*4MWh