FOB Price
Obtenir le dernier prix10 /
|Minimum Order
Localité:
Shanghai
Prix de commande minimale:
Commande minimale:
1
Packaging Detail:
-
Delivery Time:
30 days after receive the deposit
Supplying Ability:
100
Payment Type:
-
Personne àcontacter John
1. This machine structure is a there roller symmetrical type. 2. The roll in the two lower rollers symmetrical position for the vertical movement, through the silk and silk worm drive female. the two lower rollers, through the output gear reducer with the top gear , provide torque. 3. The disadvantage is that the aircraft need to rely on other devices end plate pre-bending.