Sell UIT 400 Hydraulic Rig By IE GaraevZM, Russia
Pas encore membre de TradeKey.com? Inscrivez-vous pour vous connecter avec 9 millions d'importateurs et exportateurs.
Rejoignez-le maintenant c'est gratuit |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell UIT 400 Hydraulic Rig

Sell UIT 400 Hydraulic Rig

|

Minimum Order

Localité:

Naberezhnye Chelny City, Russia

Prix de commande minimale:

-

Commande minimale:

1

Packaging Detail:

-

Delivery Time:

on request

Supplying Ability:

-

Payment Type:

-

Contacter maintenant

IE GaraevZM

Russia

Membre gratuit

Personne à contacter Mr. Zinnur

Per. Gaidara 20, Naberezhnye Chelny, Tatarstan

Contacter maintenant

Description

Hydraulic rig UIT***0 for enterprises dealing with construction, repair, technical service of water intake, oil and gas wells. Purpose of UIT***0 rig: tripping casing columns and emergency equipment out of put in repair and liquidated water intake and oil and gas production wells in the process of repairing the current stock and developing liquidated wells for higher effectiveness of repair recovery works and for cost reductions of casing columns purchase. The equipment can also be used for liquidating seizes of the drilling rig, pump compressor and drilling pipes while water intake, oil and gas wells are tested, tapped and repaired. There is an increase of water intake, oil and gas wells with expensive casing columns inside out of use. The majority of columns after their tripping out may be used a second time so that recourses are substantially saved. A number of artesian water well holes exceeds that of oil and gas production wells, so the usage area is expanded. For water intake wells there are 2 types: filter (depth up to *5 m) and artesian (up to *******0 m). Filter wells are drilled for the nearest water bearing layer in sand grounds. The well consists of the casing column (diameter ***- **3 mm) and filter. The debit of such wells is up to 1m3/h. Service period: up to **8 years, sometimes up to *5 years. The disadvantage of filter wells is their silting. The rig for tripping casing columns out DG **0 includes the lower base plate, on which the immobile pipe clamp and power hydro cylinder of dual operation with hydraulic return are installed. Hydro cylinder rods are connected by non locating traverser carrying the upper plate with a mobile pipe clamp. Mobile and immobile pipe clamps take a form of 3 wedge like cams with a female thread, set into the shell. Hydro cylinders are connected by means of a hydraulic pump station with nominal pressure **0 atm.

Send a direct inquiry to this supplier

To:

Mr. Zinnur < IE GaraevZM >

Je veux savoir: