FOB Price
Obtenir le dernier prix|
Minimum Order
Localité:
changsha,china
Prix de commande minimale:
-
Commande minimale:
1 set
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
100sets
Payment Type:
-
Personne àcontacter Ms. ivy
Liuyang Manufacturing Industrial park, Changsha, Hunan
the advantages is as below: 1) two patents in chinaï&frac*4;Å¡the first one is ZL*******3.7, inverting cylinder as a supporting leg so as to avoid the easy breakage of cylinder which was the case with traditional design. The second one is ZL*******5.5, using the *6 cylinder clamping mechanism with multi-touching points to protect the piles from damage with clamping force . 2) structure designï&frac*4;Å¡ ï&frac*4;Žadopt variable hydraulic systems with low loss and constant power in this series , apply merging hydraulic systems in the main part so as to save *0% energy consumption; ï&frac*4;Žuse big power and great flow, and the pile driving mechanism with multi-speed operation to ensure the high efficiency of the while machine; ï&frac*4;Žcard board connection between horizontal movement mechanism and main machine body make it easy dismantled and installed; 3) corner piling technologyï&frac*4;Å¡directly move the center pile driving device to the corner piling position, add on some countweight , so its pressure can be reach to *0%**0% of center piling driving force. This structure of corner piling device won’t deform, and with the same style for the center piling, it need’t extra clamp. 4) suitable condition ï&frac*4;Žclay, soft soil, sand layer, etc; ï&frac*4;Žnoise regulated urban area; ï&frac*4;Žvibration area such as the old building, subway, overpass, etc paramete / type ZYC**0B-B rated piling pressure(KN) ***0 piling speed(m/min) fast 3.9 low 0.9 piling stroke(m) 1.9 pace(m) longitudinal 3.6 horizontal 0.7 angle range(°) *1 rise stroke (m) 1.1 square pile(mm) max â–¡**0 min … cirle pile(mm) max ï¿ **0 min … side piling space(mm) ***0 cirle piling space(mm) ***0 lifting weight(t) *6.0 lifting pile**9;s lengh(m) *5.0 power(KW) piling **1 lifting *0 main dimension(m) lenth of work *4 width of work 8.1 transprorting height 3.*5 total weight(T)≥ **0