FOB Price
Obtenir le dernier prix|
Minimum Order
Localité:
-
Prix de commande minimale:
-
Commande minimale:
5sets
Packaging Detail:
-
Delivery Time:
2days
Supplying Ability:
-
Payment Type:
-
Personne àcontacter Ms. Annie
LONGHUA, SHENZHEN, GUANGDONG
1). Shoot photo 2). English and Chinese display 3). Reliable Flash Memory Data Storage 4). Press switch button when reading data, no need touch and never be worn 5). Sound and light when reading successfully 6). With LCD display current time 7). Low battery alarm function, data full alarm function 8). Metal luxury case, water-resistant and shake-resistant, resist low temperature 9). Use RS**2/USB cable to download data, do not need communication stations *0). Low tiny-power consumption, very low static state electric current *1). Influence distance: 3 to 6cm Technical Parameter: 1). RFID: Non-contact RFid *3. *6M/**5KHZ 2). Reader Type: ISO******2, Tag-it HF, ISO****3 (TYPEA) 3). Controller: *2bit ARM CPU in a high speed 4). Storage Capacity: **6Mb Flash 5). Picture Pels: **0 thousand(VGA) upgrading to ***0 thousand(VGA) 6). LCD: TFT **0x**8 LCD, *5K color screen 7). Transfer Mode: Cable: RS**2/USB (optional) 8). Language Support: Simplified Chinese character/ traditional Chinese character/English 9). Power Dissipation: < **0 mA *0). Power Supply: 3. 6V lithium -ion battery *1). Standard Accessory: Lithium-ion Battery Cable Holster Charger Frame Specification: 1). Housing: Metal luxury case 2). Dimension: **8x*5x*0mm 3). Weight: **0g Environment: 1). Temperature: ***-**0 2). Ambient Humidity: *0%**5% 3). Waterproof & Anti-shake: IP*4 level Application Field: 1). Management of postal workers 2). Security around company facilities 3). The patrolling of residential areas and office buildings 4). Security patrols of mines and natural gas fields 5). Patrolling of oil fields and oil pipelines, petrochemical plants, and fiber-optic lines 6). Metropolitan police forces 7). Railroad inspections 8). The management of public transportation terminals 9). Management of pipelines by city governments *0). Inspections of electricity-generating facilities and transport lines