FOB Price
Obtenir le dernier prix|
Minimum Order
Localité:
-
Prix de commande minimale:
-
Commande minimale:
10sets
Packaging Detail:
-
Delivery Time:
7days after reveived payment
Supplying Ability:
-
Payment Type:
-
Personne àcontacter Ms. Jenny
No.25 Zhujiang Road, Wuxi, Jiangsu
According to the Transition Heat Pipe Tube (TT*8/***0), we developed three kind standards: NSC*****0 (*0 tubes) NSC*****2 (*2 tubes) NSC*****0 (*0 tubes) Manifold box: Aluminum alloy with powder painting Manifold pipe: copper tube with 1.5mm thickness Insulation: Rock Wool Vacuum tube: twin-glass with AL/N/AL Coating Heat pipe: copper with 0.*5mm thickness Support frame: 1.5mm thickness ****2B Stainless Steel Tube Holder(bottom):Nylon*6 Working Pressure:0.6Mpa Effciency:*6.9% Mounting material for slope roof and flat roof is available. For more information, please contact me, thanks.