FOB Price
Obtenir le dernier prix|
Minimum Order
Localité:
-
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
-
Personne àcontacter Mr. Ember
Zhenxi Industrial Park, Henglin Town, Changzhou, Jiangsu
1, The heat collector and the water tank are separated, and the system works under pressure. 2, Intelligent controller to assure runs automatically. 3, The storage water tank could be placed in any place of the room. 4, The heat pipe collector and double loop system to ensure no freezing and the system could work all year. 5, The American ***** water tank is applied, very convenient to use. 6, The split system could be combined with existing systems. 7, The system could be installed easily.