FOB Price
Obtenir le dernier prix|
Minimum Order
Localité:
-
Prix de commande minimale:
-
Commande minimale:
-
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
-
Personne àcontacter Ms. anna
NO.8 xinlin industrial park zhonglou, changzhou, jiangsu
Single pipeline working station system BC**6 Main technical data ***** size:**0×**0×**0mm ***** consumption:≤3W 3.Accuracy of temperature measuring:±2℃ ***** of temperature measuring:0~*9℃ 5.Power of controlled pumps (temperature difference circulation pump, water-using end circulation pump):ï&frac*4;Å“**0W ***** booster power:≤***0W 7.System working pressure:0.6MPA ***** signal:3 temperature sensors(for top of tank, for heat collector, for bottom of tank) ***** signal:3(electronic booster, temperature difference circulation pump and water-using end circulation pump) Main functions 1.Display clock and week 2.Display temperature ***** difference circulation pump provide three working scopes to choose ***** difference circulation ***** periods timing circulation for pipeline ***** peroids timing heating ***** protection for heat collector ***** function 9.Display the fault of storage tank temperature *0.Display the flux *1.Display the system pressure Double pipeline working station system BC**6 Main technical data ***** size:**0×**0×**0mm ***** consumption:≤3W 3.Accuracy of temperature measuring:±2℃ ***** of temperature measuring:0~*9℃ 5.Power of controlled pumps (temperature difference circulation pump, water-using end circulation pump):ï&frac*4;Å“**0W *****al booster power:≤***0W ***** signal:3 temperature sensors(for top of tank, for heat collector, for bottom of tank) ***** signal:3(electronic booster, temperature difference circulation pump and water-using end circulation pump) 9.System working pressure:0.6MPA Main functions 1.Display clock and week 2.Display temperature:for top of tank, for heat collector, for bottom of tank ***** difference circulation pump provide three working scopes to choose ***** difference circulation ***** periods timing circulation for water-using end ***** periods timing heating ***** protection for heat